Plan the technology.
Then move.
An office move affects more than desks and broadband. Use this checklist to bring the right people into decisions about cabling, connectivity, phones, IT, and fire and security before fit-out work makes changes harder.

Start with the decisions that affect every team.
A data point in the wrong place can affect a desk, a phone, a camera, or a door controller. A delayed internet connection can hold up both staff devices and cloud calling. The practical first step is to put the floor plan, occupancy plan, move date, and existing system details in one brief.
UTL Group brings together structured cabling, business communications, IT support, and fire and security. Each project needs its own survey and scope; this guide helps you prepare useful questions before those conversations.
Six conversations to have before the move.
Work through these with your facilities, operations and technology contacts. Keep a record of what is confirmed, what needs a survey and who owns each decision.
- 01
Map people and spaces.
Mark workstations, meeting rooms, reception, shared devices, wireless coverage areas and any spaces that will open later. Confirm how many people need to work on day one and which parts of the site must stay operational during the move.
- 02
Plan cabling before walls and ceilings close.
Ask where data outlets, fibre links, cabinets and wireless access points belong. Include devices outside desk areas, such as door controllers, cameras, alarms and building systems. Agree cable routes, power and testing requirements with the fit-out team.
- 03
Check connectivity and calling early.
Find out what connectivity is available at the new address and when it can be installed. List the numbers, call flows, handsets and remote users that must continue to work. Plan a tested changeover rather than assuming a new connection will be ready on moving day.
- 04
Decide what IT moves, changes or retires.
Inventory devices, network equipment, Microsoft 365 access, printers, backup arrangements and any on-site servers. Identify dependencies between the old and new sites, and decide who will configure and test each system before staff arrive.
- 05
Review fire and security requirements for the new premises.
Walk through entrances, access levels, monitoring needs, fire alarm arrangements and emergency procedures with the people responsible for the building. Confirm what is already installed, what can be retained and what needs specialist assessment; requirements depend on the premises and its use.
- 06
Agree the sequence and handover.
Put installation, configuration, testing and staff handover into one timeline. Identify a named owner for each dependency, a fallback if the connection is delayed, and a way to report issues on the first working day.
What should you bring to the first meeting?
- A current and proposed floor plan, including any phased fit-out.
- Your target move date and the dates each area must be usable.
- A list of existing internet, phone, IT, access and alarm systems, including contract or service contacts.
- Known constraints: landlord approvals, out-of-hours access, occupied areas, and equipment that must remain live.
- One contact who can make decisions for each workstream.
Do not have everything yet? Start with the plan and the dates. A survey can identify the missing technical details.